Home > Project References
Typically
Project References

HOTEL

BUILDING

FACTORY
Building Name
Use of Building
Place
Application
Date
Warranty
Phase
: The Continent Hotel Bangkok
: Hotel
: Bangkok/Thailand
: Renovate Hot Water Pipe System.
: November 2018
: 1 Year
: First
Building Name
Use of Building
Place
Application
Date
Warranty
Phase
: Phufa Waree Chiang Rai Resort
: Hotel & Resort
: Chiang Rai/Thailand
: Design and Installation VSD Independent Control of Hot Water Booster Pump System. Power Drive : 4 kW
: November 2018
: 1 Year
: First
Building Name
Use of Building
Place
Application
Date
Warranty
Phase
: CH Hotel Chiang Mai
: Hotel
: Chiang Mai/Thailand
: Renovate Heat Pump for Make Up Hot Water. Capacity Heating 45 kW. 2 Unit
: November 2018
: 1 Year
: First
Building Name
Use of Building
Place
Application
Date
Warranty
Phase
: Mercure - Koh Samui
: Hotel
: Surat Thani/Koh Samui/Thailand
: Design and Installation Hot Water Tank 15,000L and Hot Water Piping. Max. Working Pressure at 10 barg.
: December 2018
: 3 Year
: First
Building Name
Use of Building
Place
Application
Date
Warranty
Phase
: Nak Nakara Hotel Chiang Rai
: Hotel
: Chiang Rai/Thailand
: Design and Installation Heat Recovery for Spa. Gasket Plate Heat Exchanger Type. Heating Capacity 25 kW
: December 2018
: 1 Year
: First
Building Name
Use of Building
Place
Application
Date
Warranty
Phase
: Aloha Resort - Koh Samui
: Hotel
: Chiang Rai/Thailand
: Installation Heater Generator for Hot Water System. Heating Capacity 25 - 50 kW
: January 2019
: 2 Year
: First
Building Name
Use of Building
Place
Application
Date
Warranty
Phase
: Grand Mecure Fortune
: Hotel
: Bangkok/Thailand
: Renovate Heat Pump for Generate Hot Water. Capacity Heating 65 kW.
: February 2019
: 1 Year
: First
Building Name
Use of Building
Place
Application
Date
Warranty
Phase
: Praso - Ratchada 12
: Hotel
: Bangkok/Thailand
: Design and Installation VSD Independent Control of Cold Water Booster Pump System. Power Drive : 2.2 kW
: February 2019
: 1 Year
: First
Building Name
Use of Building
Place
Application
Date
Warranty
Phase
: Grand Mecure Fortune
: Hotel
: Bangkok/Thailand
: Preventive Maintenance Heat Pump for Generate Hot Water. Capacity Heating 60 kW. 2 Unit
: February 2019
: 6 Month
: Second
Building Name
Use of Building
Place
Application
Date
Warranty
Phase
: Anantara Lawana - Koh Samui
: Hotel & Resort
: Surat Thani/Koh Samui/Thailand
: Design and Installation Heatpump Capacity 14 kW at 3 Unit. Hot Water Tank 2500L at 3 Unit and Hot Water Pipe.
: February 2019
: 3 Year
: First
Building Name
Use of Building
Place
Application
Date
Warranty
Phase
: Praso - Ratchada 12
: Hotel
: Bangkok/Thailand
: Design and Installation Hot Water Tank. Capacity 3000L at 2 Unit. Max Working Pressure 10 barg.
: March 2019
: 3 Year
: Second
Building Name
Use of Building
Place
Application
Date
Warranty
Phase
: Anantara Lawana - Koh Samui
: Hotel & Resort
: Surat Thani/Koh Samui/Thailand
: Design and Installation Heatpump Capacity 14 kW at 3 Unit. Hot Water Tank 2500L at 3 Unit and Hot Water Pipe.
: February 2019
: 3 Year
: Second
Building Name
Use of Building
Place
Application
Date
Warranty
Phase
: Le Meridien - Bangkok
: Hotel
: Bangkok/Thailand
: Design and Installation Heatpump Capacity 70 kW at 3 Unit and Hot Water Pipe.
: February 2019
: 3 Year
: First
Building Name
Use of Building
Place
Application
Date
Warranty
Phase
: Anantara Lawana - Koh Samui
: Hotel & Resort
: Surat Thani/Koh Samui/Thailand
: Design and Installation Cold Water Booster Pump. VSD Independent Control. Web Monitoring and Cold Water Piping.
: February 2019
: 1 Year
: Third
Building Name
Use of Building
Place
Application
Date
Warranty
Phase
: Phufa Waree Chiang Rai Resort
: Hotel & Resort
: Chiang Rai/Thailand
: Design and Installation VSD Independent Control of Cold Water Booster Pump System. Power Drive : 2.2 kW
: March 2019
: 1 Year
: Second
Building Name
Use of Building
Place
Application
Date
Warranty
Phase
: Le Meridien - Bangkok
: Hotel
: Bangkok/Thailand
: Overhaul Cylinder head Fire Pump Engine.
: March 2019
: 1 Year
: Second
Building Name
Use of Building
Place
Application
Date
Warranty
Phase
: Merriott Hotel - Surawong
: Hotel
: Bangkok/Thailand
: Replacement and Installation Double Wall Heat Exchanger for Heat Pump 50kW, 35kW, 30kW, 25kW at 10 Unit
: March 2019
: 1 Year
: First
Building Name
Use of Building
Place
Application
Date
Warranty
Phase
: Le Meridien - Bangkok
: Hotel
: Bangkok/Thailand
: Overhaul Motor Drive of Transfer Pump.
: April 2019
: 1 Year
: Second
Building Name
Use of Building
Place
Application
Date
Warranty
Phase
: Anantara Lawana - Koh Samui
: Hotel & Resort
: Surat Thani/Koh Samui/Thailand
: Overhaul Cold Water Booster Pump at 4 Unit
: April 2019
: 1 Year
: Third
Building Name
Use of Building
Place
Application
Date
Warranty
Phase
: Grand Four Wings Hotel
: Hotel
: Bangkok/Thailand
: Design and Installation Heatpump Capacity 60 kW at 3 Unit and Hot Water Pipe.
: April 2019
: 2 Year
: First
Building Name
Use of Building
Place
Application
Date
Warranty
Phase
: CH Hotel Chiang Mai
: Hotel
: Chiang Mai/Thailand
: Design and Installation Hot Water Tank. Capacity 10000L. Max Working Pressure 10 barg.
: October 2019
: 3 Year
: Second
Building Name
Use of Building
Place
Application
Date
Warranty
Phase
: The Continent Hotel Bangkok
: Hotel
: Bangkok/Thailand
: Contact Service - Heat Pump 35 kW, for 3 Unit
: November 2019
: -
: Second
Building Name
Use of Building
Place
Application
Date
Warranty
Phase
: W Hotel - Surawong
: Hotel
: Bangkok/Thailand
: Preventive Maintenance Heatpump 35kW : 3 Unit
: November 2019
: -
: First
Building Name
Use of Building
Place
Application
Date
Warranty
Phase
: Casino/Hotel
: Myanmar
: Overhaul Air Cooled Chiller, Cooling Capacity 200 Tons
: December 2019
: 1 Year
: First
Building Name
Use of Building
Place
Application
Date
Warranty
Phase
: Sathorn Thani Building
: Building
: Bangkok/Thailand
: Replacement and Installation Cold Water Transfer Pump to Rooftop.
: March 2019
: 3 Year
: First
Building Name
Use of Building
Place
Application
Date
Warranty
Phase
: PG Rama 9 - Condo
: Condo
: Bangkok/Thailand
: Design and Installation VSD Independent Control of Cold Water Booster Pump System. Power Drive : 2.2 kW
: March 2019
: 1 Year
: First
Building Name
Use of Building
Place
Application
Date
Warranty
Phase
: Tree On 3 - Bangkok
: Market Store
: Bangkok/Thailand
: Preventive Maintenance Fire Pump Engine.
: April 2019
: -
: First
Building Name
Use of Building
Place
Application
Date
Warranty
Phase
: Suvarnabhumi Airport
: Building
: Bangkok/Thailand
: Replacement and Installation Cold Water Booster Pump.
: April 2019
: 1 Year
: First
Building Name
Use of Building
Place
Application
Date
Warranty
Phase
: Homestay
: Rayong/Thailand
: Replacement and Installation Cold Water Booster Pump.
: April 2019
: 1 Year
: First
Building Name
Use of Building
Place
Application
Date
Warranty
Phase
: Prayut - Coconut Food
: Factory
: Ratchaburi/Thailand
: Design and Installation Vacuum Oven, Conveyor Dryer. Production Capacity : 150 kg/day
: April 2018
: 1 Year
: First
Building Name
Use of Building
Place
Application
Date
Warranty
Phase
: Delta Electronics (Thailand) public company limited
: Factory
: Samut Prakan/Thailand
: Replacement and Installation Double Suction Split Case of Fire Pump.
: April 2019
: 3 Year
: First
Building Name
Use of Building
Place
Application
Date
Warranty
Phase
: K.P. Agro Industry (Lopburi)
: Factory
: Lopburi/Thailand
: Installation Fire Pump and Piping Fire Fighting Systems
: May 2019
: 3 Year
: First
Building Name
Use of Building
Place
Application
Date
Warranty
Phase
: SCG - COTTO
: Factory
: Nakhon Ratchasima/Thailand
: Audit Efficiency Air Cooled Chiller 150 Tons
: November 2019
: -
: First